Client
Rock Productions Pte Ltd, CapitaLand Mall Asia Limited
Involvement
Design and Project Architect
Completion Year
2012
Gross Area
62,000 sq m
Designed by Andrew Bromberg at Aedas, The Star celebrates the rich and diverse happenings inside the building with a multi-faceted, permeable and dynamic design, blurring the boundaries between public and private realms as well as retail and cultural components. The 62,000-square-metre development comprises The Star Performing Arts Centre with a 5,000-seat theatre, and The Star Vista with food-and-beverage-based retail facilities. The south elevation is completely opened up and its facilities are clearly visible from outside. One can crawl under, transverse around and climb onto the complex via a series of ramps, escalators and terraces.